Two Bedroom Flat Refurbishment
Boscombe
•
April 2024
This is one of 4 flats in the same block we refurbished. Like them all it had been condemned by the council due to the condition of it. Everything had to be removed, even the plaster got taken back to the brick work. The flat was fully rewired, new plumbing and drainage, brand new bathroom that was fully tiles, a new fitted kitchen with appliances, this was particularly difficult in this flat due to the curved windows. Full new windows and oak internal fire doors. Fully boarded and plastered throughout with new flooring, woodwork and decorating. The commercial client was very pleased with the outcome, now onto the next flat!
Other works:

Shop Refurbishment
Boscombe
August 2024

In / Out Redeck
Romsey
July 2024

Sandstone Patio with Artificial Grass & Decorative Stones
Southsea
May 2024

Resin Artwork
Across the South Coast

Two Bedroom Flat Refurbishment
Boscombe
April 2024

Resin and Artificial Lawn Top Surface
Salisbury
March 2024

Large New Resin Patio
New Forest
January 2024

Raised Composite Deck & Fence
Swindon
October 2023

Small Deck & Artificial Grass
Limington
September 2023

Overgrown to Complete in 2 Days
Southampton
July 2023