Two Bedroom Flat Refurbishment
Boscombe
•
April 2024
This is one of 4 flats in the same block we refurbished. Like them all it had been condemned by the council due to the condition of it. Everything had to be removed, even the plaster got taken back to the brick work. The flat was fully rewired, new plumbing and drainage, brand new bathroom that was fully tiles, a new fitted kitchen with appliances, this was particularly difficult in this flat due to the curved windows. Full new windows and oak internal fire doors. Fully boarded and plastered throughout with new flooring, woodwork and decorating. The commercial client was very pleased with the outcome, now onto the next flat!
Other works:

Unsuitable Garden to Fully Usable
Botley
May 2025

Small Bathroom Revamp
Bournemouth
April 2025

The Full Works - Compoisite Fence/Deck and Resin Driveway/Paths
Portchester
March 2025

Over The Top Resin Driveway
Locks Heath
February 2025

Kitchen in 2nd Floor Flat
Bournemouth
January 2025

New Fixed Size Extension with Kitchen Add-on
Fareham
December 2024

Composite Decking with Boarder
Chandlers Ford
November 2024

Working Out of Area
Bishops Cleeve
November 2024

Commercial Project - Stud Work Week
Boscombe
October 2024

Resin Driveway for Park Home
Ringwood
September 2024