Small Bathroom Revamp
Bournemouth
•
April 2025
After being recommended to us from another customer, this customer decided to have their bathroom fully revamped. They were struggling with getting in the bath and the fact the bathroom was last renewed in the early 90s meant it was time for a change.
After removing all the old suit, tiles and some of the floor we set to work on installing all new plumbing and a new stud wall so we could create some, in shower shelving. The bath was replaced by a new shower unit, providing lots more room to move around for the toilet and sink.
The bathroom was fully tiled, full new suite, new power shower, new flooring and to finish a new chrome duel fuel towel rail. All complete within 7 days, another very happy customer.
Other works:

Unsuitable Garden to Fully Usable
Botley
May 2025

Small Bathroom Revamp
Bournemouth
April 2025

The Full Works - Compoisite Fence/Deck and Resin Driveway/Paths
Portchester
March 2025

Over The Top Resin Driveway
Locks Heath
February 2025

Kitchen in 2nd Floor Flat
Bournemouth
January 2025

New Fixed Size Extension with Kitchen Add-on
Fareham
December 2024

Composite Decking with Boarder
Chandlers Ford
November 2024

Working Out of Area
Bishops Cleeve
November 2024

Commercial Project - Stud Work Week
Boscombe
October 2024

Resin Driveway for Park Home
Ringwood
September 2024