Composite Decking with Boarder
Chandlers Ford
•
November 2024
Our teams work all year around, however this particular job was a real wet one. Even with all the wet weather gear and site gazebos they crew still got soaked.
This customer had an old timber deck which was rotting and very slippery. We removed it and disposed of all the waste, uncovering a nice hidden drain. After we installed a new treated timber frame with joist protection tape we set to work installing the new anti-slip composite deck.
The colour choice for this one was our woodgrain stone grey with a charcoal boarder and charcoal face boards, we even made a small access panel for the hidden drain.
Other works:

Unsuitable Garden to Fully Usable
Botley
May 2025

Small Bathroom Revamp
Bournemouth
April 2025

The Full Works - Compoisite Fence/Deck and Resin Driveway/Paths
Portchester
March 2025

Over The Top Resin Driveway
Locks Heath
February 2025

Kitchen in 2nd Floor Flat
Bournemouth
January 2025

New Fixed Size Extension with Kitchen Add-on
Fareham
December 2024

Composite Decking with Boarder
Chandlers Ford
November 2024

Working Out of Area
Bishops Cleeve
November 2024

Commercial Project - Stud Work Week
Boscombe
October 2024

Resin Driveway for Park Home
Ringwood
September 2024