Old Shop Demo
Boscombe
•
March 2023
The large commercial unit was being reduced to a 1/3 of its size to make way for 4 new residential units. The demolition works stated by weeks of work inside due to the age of the property and the vast maze of wiring, pipework, multiple ceilings and asbestos. Before we could demo the actual structure, we had to build a new wall to contain the remaining shop. Our 5 ton machine made quick progress on the structure and within a matter of days the building was down. The access for this project was so tight that all the waste had to be removed in 4 ton loads, with our full waste carriers licence we removed 250 ton of rubble, 20 tons of timber, 18 ton of general waste and nearly 2 ton of specially wrapped and sealed asbestos.
Other works:

Shop Refurbishment
Boscombe
August 2024

In / Out Redeck
Romsey
July 2024

Sandstone Patio with Artificial Grass & Decorative Stones
Southsea
May 2024

Resin Artwork
Across the South Coast

Two Bedroom Flat Refurbishment
Boscombe
April 2024

Resin and Artificial Lawn Top Surface
Salisbury
March 2024

Large New Resin Patio
New Forest
January 2024

Raised Composite Deck & Fence
Swindon
October 2023

Small Deck & Artificial Grass
Limington
September 2023

Overgrown to Complete in 2 Days
Southampton
July 2023