Old Shop Demo
Boscombe
•
March 2023
The large commercial unit was being reduced to a 1/3 of its size to make way for 4 new residential units. The demolition works stated by weeks of work inside due to the age of the property and the vast maze of wiring, pipework, multiple ceilings and asbestos. Before we could demo the actual structure, we had to build a new wall to contain the remaining shop. Our 5 ton machine made quick progress on the structure and within a matter of days the building was down. The access for this project was so tight that all the waste had to be removed in 4 ton loads, with our full waste carriers licence we removed 250 ton of rubble, 20 tons of timber, 18 ton of general waste and nearly 2 ton of specially wrapped and sealed asbestos.
Other works:

Unsuitable Garden to Fully Usable
Botley
May 2025

Small Bathroom Revamp
Bournemouth
April 2025

The Full Works - Compoisite Fence/Deck and Resin Driveway/Paths
Portchester
March 2025

Over The Top Resin Driveway
Locks Heath
February 2025

Kitchen in 2nd Floor Flat
Bournemouth
January 2025

New Fixed Size Extension with Kitchen Add-on
Fareham
December 2024

Composite Decking with Boarder
Chandlers Ford
November 2024

Working Out of Area
Bishops Cleeve
November 2024

Commercial Project - Stud Work Week
Boscombe
October 2024

Resin Driveway for Park Home
Ringwood
September 2024